![]() |
| |||||||
Automation Anywhere Post messages and questions related to Automation Software here. |
![]() |
| | LinkBack | Thread Tools | Display Modes |
| |||
|
I have a task, and within this task, I run about 50 sequential tasks. These tasks run really slow when run this way, but if I run them individually, they all run very fast. I have my replay speed set to high-speed on all of them. I also have very small delays within the tasks. The tasks run even slower than the original speed I recorded them in. Does anybody else have this issue, or know of a way to remedy it?
|
| |||
|
Hello Marc, Actually when a task calls another task, a new instance of Automation Anywhere starts and so it takes a certain time to load the task. However, when the task starts to run, it will run at the normal speed as it is set to. The reason of task running slow is possibly only the loading time of macros. |
| |||
|
I did notice that that was an issue, but thats ok. The Mouse moves are the issue here though. They go even slower than the speed I recorded them in. I removed the mouse moves in my tasks and not its really fast (a bit too fast in certain areas - but alot better than before). I have the speed option for all my tasks set to High speed.
|
![]() |
| Thread Tools | |
| Display Modes | |
| |